Constructora Elevação

BAHIAGÁS GASODUCT | CAMAÇARI (BA)

Construction of 2 pipelines for in 2020, Elevação carried out the Construction and Assembly Work for Gas Distribution in carbon steel and ERPM.

With supply and installation of metallic supports for pipes. Installation of DN 16” 5D 90 degrees curves, DN 12” block valves and DN 10” Valves. Supply of materials and installation of the DPJI system.

The construction of the shelter for the monitoring system and AC Gas Pipeline Interconnection in Existing Network DN 18 x 16”.

SERVICES PERFORMED

● Prefabrication and Assembly of LOW Valve Station.
● Execution of Topographic Surveys.
● Earthworks/Leveling the Station Mounting Ground.
● Technological tests of compression.
● Manufacture of bases and drainage system.
● Blasting and painting of applied piping.
● Drilling / Interconnection in pre-existing 18-inch GAS PIPELINE.
● Elaboration of executive project.
● Diameter: 16″.
● Length: 14,599 meters.
● Material: Carbon Steel.
● Non-Destructive Method (MND): 5,740 meters.
● Open ditch: 8,859 meters.

CLIENT: BAHIAGÁS
SEGMENT
: GAS PIPELINE
LOCATION
: CAMAÇARI/BA

  • Clients:
    Logum
  • Category:
    Oil, Gas and Ethanol
  • Date: